Service delivery operations

Every promise your operation makes, kept on the line.

Verolane puts every customer commitment on one lane — intake to settlement — and tells you, in minutes rather than colours, exactly how far it has drifted from the window you sold.

Book a scoping callSee how it worksLive in one region in 17 days

Verolane vocabulary

Drift
The predicted deviation, in minutes, between where a commitment is now and the window you sold. Scored continuously from travel, crew load, parts position and the site’s own history — with a confidence band attached.

Seen on every row of the board below

Operating picture · Today

RegionFilter

Commitment

Drift

12 commitments in view · 3 drifting past toleranceLive
98.4%Commitment attainmentMedian across live accounts, Q3
41 minEarlier drift detectionAgainst the planner's own spot checks
6.2×Faster exception closeFrom detection to an agreed new window
32Connected systemsCAFM, telematics, ERP, comms, identity

Running on Verolane

Northgate FacilitiesBrackmoor UtilitiesHalverson Cold ChainPentworth RetailCassenwood HealthDrayfield Energy
01 / 07

The gap nobody owns

Most operations find out too late, then argue about it too long.

Between the moment a commitment starts slipping and the moment somebody acts on it, there is a gap. In most service businesses that gap is measured in hours, it belongs to nobody, and it is where attainment is actually lost.

What that gap costs

  • The plan stops being defended

    When windows slip routinely, planners treat the schedule as an aspiration and assignment drifts to whoever is nearest.

  • The evidence stops being collected

    Crews under time pressure take fewer photographs. The absence surfaces eleven weeks later, in a disputed claim.

  • The review stops being a review

    Both sides arrive with different numbers and spend forty minutes reconciling them instead of fixing the operation.

What closes it

Deviation, in a unit people can act on.

Almost every recovery that is possible at all is possible early. Verolane scores predicted drift on every open commitment from travel, crew load, parts position and the site’s own history — then puts the three resolutions that actually work in front of the person who can use them.

Minutes, not coloursA predicted drift of 40 minutes at 11:00 is a decision. A red dot at 15:30 is a post-mortem.
Reason codes from the evidenceAccess, travel, parts, scope and trade codes applied automatically, not typed into a comment box.
Priced against the contractExposure calculated from the customer's own service schedule, so priority calls stop being opinions.
How the platform works
02 / 07

The platform

Four things Verolane does that a system of record was never built to do.

Your CAFM, service desk and telematics keep doing their jobs. Verolane sits above them and gives the work a shared shape.

01

One line, intake to settlement

Every commitment travels the same six-stage lane, whatever system created it. Planners stop reconciling three tools and start reading one board.

  • Deduplicated intake from CAFM, inbox and API
  • Tiering applied at creation, not after the argument
  • Settlement gated on the evidence the contract asks for
02

Drift, before it becomes a breach

Verolane scores the predicted deviation from every committed window using travel, crew load, parts position and the site's own history. You see the slip while it is still cheap.

  • Live drift in minutes, not a red/amber dot
  • Reason codes attached automatically
  • Penalty exposure priced against the contract
03

An exception desk, not an inbox

When something moves off the line it lands on a desk with the three actions that actually resolve it. Every action writes back to the customer, the crew and the record.

  • Actions scoped to the reason code
  • One-tap re-window with customer notification
  • Full decision trail for the contract review
04

Accountability you can hand to a client

Attainment, drift causes and evidence packs export as the report your customer already asks for every month — without a planner rebuilding it in a spreadsheet.

  • Per-contract attainment with drift attribution
  • Evidence packs with timestamps and geolocation
  • Scheduled delivery to the customer's own portal
03 / 07

Exception desk

When something leaves the line, it lands somewhere with actions on it.

Not an alert channel, not an inbox. Each open exception arrives with its reason code, its live exposure and the small number of resolutions your own ops leads have said actually resolve it. Try one.

VL-4830Tier 1

Cable fault localisation

Access held at gate — permit not lodged

Detected10:52
Drift+63m
Exposure£2,400 / hour after 14:00
VL-4825Tier 1

Medical gas line certification

Second engineer required for sign-off

Detected12:14
Drift+41m
ExposureWard reopening slips to 17:00
VL-4822Tier 2

Ring main unit inspection

Travel drift — A1 closure northbound

Detected13:40
Drift+18m
ExposureWithin tolerance until 16:20

Automation you can read out loud.

Signal rules are written as sentences — when, and, then. They can be replayed over last month before they touch anything live, and every firing is recorded against the commitment it changed.

Browse the feature index

Duty lead digest

  • 14:02VL-4830 opened — access held at gate, 63 min driftBrackmoor Utilities · Tier 1
  • 13:51VL-4832 settled 3 minutes inside windowHalverson Cold Chain · 6 assets
  • 13:40Tier 1 drift guard fired on VL-4822Travel reason code applied
  • 13:12P. Nayar: customer accepts 16:00 on the Derby wingCassenwood Health
  • 12:58VL-4826 settled 22 minutes earlyDrayfield Energy · 9 assets
04 / 07

Accountability

The monthly pack stops being a rebuild and starts being a record.

Attainment, drift attribution and evidence generate against each contract's own service schedule — the report your customer already asks for, without a planner reassembling it in a spreadsheet.

Commitment attainment

98.4%

7.0 pts over 10 weeks · target 96%

90939699Wk 31Wk 34Wk 37Wk 40

Where the minutes actually go

Drift attribution, last quarter

Access & permits31% 6 pts against last quarter
Travel24% 2 pts against last quarter
Parts on site19% 11 pts against last quarter
Scope found on arrival15% 4 pts against last quarter
Second trade required11% 3 pts against last quarter
05 / 07

Planning and rules

A plan the day can actually cash.

Assignment respects certification, travel cost and a hard load ceiling per crew. When reality moves, the rules that respond to it are ones anyone in a governance meeting can read.

Crew timeline · North & South East · today06:00 — 19:00

Crew

R. OkonjoRefrigeration · North
Leeds Central
Chilled aisle
Bradford Retail
82%
T. MabeyHV electrical · North
Harrogate RMU
Wetherby 12
64%
S. AldridgeFabric · North
Travel
Doncaster DC2
Rotherham fit-out
91%
K. FarrowMedical gas · Midlands
Derby wing
Nottingham clinic
77%
J. PetrieConveyor · South East
Slough
Reading Hub
48%
L. OseiGlazing · South East
Guildford High
Woking make-safe
55%
Tier 1 drift guardLive
48 firings · 30 d
When

Predicted drift on a Tier 1 commitment passes 20 minutes

And
  • Customer has a contractual penalty window
  • No exception already open
Then
  • Open an exception with the travel reason code
  • Page the regional duty lead
  • Post the revised window to the customer portal
Unclaimed intakeLive
126 firings · 30 d
When

A commitment sits in Intake for more than 45 minutes

And
  • Inside working hours for the region
Then
  • Assign the next qualified crew by travel cost
  • Notify the planner in Slack
Evidence gateLive
311 firings · 30 d
When

A crew requests settlement

And
  • Commitment requires photographic evidence
  • Fewer than three assets attached
Then
  • Hold settlement
  • Return the job to Verify with a checklist
Weekend escalation quiet hoursPaused
0 firings · 30 d
When

An exception opens between 22:00 and 06:00

And
  • Tier is 2 or lower
Then
  • Queue the escalation for 06:00
  • Leave the customer notification unsent
06 / 07

Built for

Operations where the promise is the product.

Facilities management

Hard and soft services across a client estate, where the contract is written in response and rectification times.

  • Response clocks measured differently by client and contractor
  • Evidence scattered across engineer phones
  • Monthly attainment rebuilt by hand
71%fewer disputed claims

Field service

Reactive and planned maintenance on installed equipment, where a missed window costs a second visit.

  • First-time-fix hidden until the van has left
  • Parts position unknown at assignment
  • Re-windows agreed verbally and never recorded
1.4×first-time-fix uplift

Retail and estate rollout

Sequenced programmes across hundreds of sites, where one late trade pushes the whole week.

  • Dependencies tracked in a programme spreadsheet
  • Site readiness confirmed too late
  • No single view of the week's slip
3 daysearlier slip visibility
07 / 07

Customers

What changes is the conversation.

We stopped arguing about what happened and started agreeing what happens next.
Priya NayarOperations Director, Northgate Facilities
Read the Northgate case study

Two quarters after go-live

  • 71%fewer disputed response claims
  • 98.4%Tier 1 attainment, up from 91.2%
  • £310kpenalty exposure avoided

Next step

See one afternoon of your own operation on a single line.

Bring the commitment that slips most often. We will shape it, connect its source system and show you the drift you are currently finding out about too late.

  • 30 minutes, no slide deck
  • Your own data, not a canned demo
  • A written answer on whether this fits